What is the material and tools for installing the AAC Panel in Australia?

Tools

The tools for installing AAC panels in Australia are divided into two categories: electric and manual. In this section, we will try to mention all these tools from the first step to the end.

  The first step to install the panels is the preparation of the sub-work of the panels. To install the damp course and Serking, we need a hand stapler, a special needle, and a cutter to cut the Serking, which is placed in the manual tool section.

  After completing this step, we need two types of tools to install Top Hats on the wall, one for installation, which is usually a rechargeable drill with a special pin for 40 or 10 mm screws for wooden or iron frames, and the other is an electric tool for cutting Top Hats with different brands. It is better that both of these tools are rechargeable due to the large use of these two tools in different places of the site.

In the next step, we will install the panels. For the installation, we need a cordless drill and a special pin for the screws. For the 50 and 75 mm panels, the screws are used with a length of 75 and 100 mm, respectively. A hand wheel can be used to move the panels to different places on the site. He also used an E-shaped lifter to lift and place it on the floor concrete. In some cases, BAR WRECKING is used for partial breaking. To cut the panels, you can use two cutting devices that can be adjusted in thickness, rechargeable or normal, with a special blade for panels. Also, to glue the ACC panels to each other, a special type of water-based powder glue is needed, and for its preparation, a rechargeable or ordinary mixer is needed. Also, trowel, Hawk, Scoop are needed for placing special glue between panels. A hammer and sandpaper for the panel may be needed during installation.